Pallade Veneta - Medieval tower partially collapses in Rome, trapping worker

Medieval tower partially collapses in Rome, trapping worker


Medieval tower partially collapses in Rome, trapping worker
Medieval tower partially collapses in Rome, trapping worker / Photo: Tiziana FABI - AFP

A medieval tower in central Rome that was under renovation partially collapsed on Monday, with one worker trapped alive under rubble, authorities said.

Change text size:

Part of the Torre dei Conti collapsed just after 11:30 am (1030 GMT), sending rubble into the street and a thick white cloud of dust into the air.

"It's a very complex situation for the firefighters because there is a person trapped inside," Rome Prefect Lamberto Giannini told reporters.

The trapped worker, a Romanian national, was "conscious", the Romanian foreign ministry said.

Three other workers were evacuated from the site, one of them in a critical condition, a spokesman for the fire service told AFP.

The tower is in a busy area, just off the Imperial Forum and close to the Colosseum, Italy's top tourist site.

Rome Mayor Roberto Gualtieri and Italian Culture Minister Alessandro Giuli were present as firefighters cordoned off the street and moved back crowds.

A second partial collapse of the tower about one and a half hours later sent up further billowing clouds of dust.

After the first collapse, firefighters managed to "put up some protection" around the trapped man, so when the second collapse occurred, "they obviously shielded him", Giannini said.

With dust still in the air, firefighters used cranes to reach tower windows, while a drone entered through another window for an inspection.

An AFP journalist witnessed the arrival of specialised search and rescue firefighter units.

One worker inside at the time of the first collapse told AFP he escaped from a balcony.

"It was not safe. I just want to go home," said the man, white dust covering his uniform, who gave his name as Ottaviano and his age as 67.

The Torre dei Conti, dating from the early 13th century, was being restored with European Union funds.

Prefect Giannini said the rescue operation would be long and difficult.

"It will be a very long operation because we have to try to save the person, but we also have to try to mitigate... the enormous risks faced by the people trying to carry out the rescue," he said.

"We hope the outcome will be good, but it is not easy."

- Russian ambassador summoned -

Monday's collapses affected a buttress and part of the tower's base, then part of the stairwell and the roof, Rome's Directorate of Cultural Heritage said in a statement.

The phase of work launched in June 2025, which included asbestos removal, was practically complete.

The directorate said an analysis undertaken at the start of the renovations had shown "necessary safety conditions" for the work to go ahead.

The Italian government summoned Russia's ambassador after the Russian foreign ministry spokeswoman made a link between the accident and Russia's support for Ukraine.

"As long as the Italian government keeps uselessly wasting taxpayers' money, all of Italy will collapse, from the economy to its towers," said the Kremlin spokeswoman, Maria Zakharova.

Italy's foreign minister, Antonio Tajani, slammed Zakharova's remarks as "shameful, unacceptable".

R.Zarlengo--PV

Featured

Kate McClymont Testifies at Alan Jones Trial Over Reporting Methods

Investigative journalist Kate McClymont took the stand in the thirteenth week of the trial against former radio personality Alan Jones, facing rigorous cross-examination over her reporting methodology. Her testimony focused on text message exchanges with police and the verification process that led to the legal proceedings.

Chervon Names Doug Palmer Vice President of Finance - Canada

TORONTO, ON / ACCESS Newswire / November 5, 2026 / Effective November 9, 2026, Chervon names Doug Palmer Vice President of Finance - Canada, reporting to Neil Harrison, Vice President and Managing Director of Chervon Canada. He will also have a dotted-line reporting relationship to Ryan Wang, Chief Financial Officer, Chervon NA.

Polaris Renewable Energy Announces Q3 2026 Results

TORONTO, ON / ACCESS Newswire / November 5, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris Renewable Energy" or the "Company"), is pleased to report its financial and operating results for the three and nine months ended September 30, 2026. This earnings release should be read in conjunction with the Company's consolidated financial statements and management's discussion and analysis, which are available on the Company's website at www.PolarisREI.com and have been posted on SEDAR+ at www.sedarplus.ca. The dollar figures below are denominated in US Dollars unless noted otherwise.

Polaris Renewable Energy Declares Quarterly Dividend

TORONTO, ON / ACCESS Newswire / November 5, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris Renewable Energy" or the "Company"), is pleased to announce that its board of directors has declared a quarterly dividend of US$0.15 per common share outstanding.

Change text size: